Lighting Control System


Light Management for Orams Marine Services Workshops

  • Sector: Other | Boat Storage + Servicing
  • Solution: zencontrol DALI-2 system
  • Status: Complete
Light Management for Orams
  • End Client: Orams Marine Centre
  • Architect: RTA Studio
  • Engineer: Electrical Consulting Services (ECS)
  • Electrical Contractor: East Coast Bays Electrical Services
  • Controls Specialist(s): Manu Bhagwanji | Julian Beckham

The Wynyard Quarter location known as Site 18 on the corner of Beaumont and Jellicoe Streets has been transformed into a centre for Orams Marine that includes a superyacht refit facility, incorporating a travel lift shed.

Read More...

Mercedes Benz Showroom – Smart Building Solution

  • Sector: Retail
  • Solution: zencontrol DALI-2 system
  • Status: Complete
smart building solution
  • End Client: Mercedes-Benz North Shore
  • Builder: Savory Construction
  • Architect: Warren and Mahoney
  • Engineer: WSP
  • Electrical Contractor: Coll Electrical
  • Controls Specialist(s): Manu Bhagwanji | Julian Beckham

Intelligent Environments were contracted by Coll Electrical to provide the smart building solution for the control of the lighting for this exciting new dealership on Auckland’s North Shore.

Read More...

Lighting Management System for Waka Kotahi, Wellington

  • Sector: Government
  • System: zencontrol
  • Status: In Progress
lighting management system
  • End Client: Waka Kotahi - NZTA
  • Engineer: Norman Disney Young
  • Electrical Contractor: Seven Electrical Wellington
  • Controls Specialist: Ian Rose | Andrew Thompson

Lighting control within Waka Kotahi’s new premises will adopt a hybrid approach comprising a combination of standalone 230v presence detectors and a DALI-2 lighting management system controlling functional areas.

Read More...

Cloud Based Lighting Control for Waiari Water Treatment Plant – Tauranga

  • Sector: Local Government
  • Solution: zencontrol DALI-2
  • Status: Complete
cloud based lighting control
  • End Client: Tauranga City Council
  • Builder: Fulton Hogan
  • Engineer: Beca
  • Electrical Contractor: McKay Electrical
  • Controls Specialist: Ian Rose

Intelligent Environments Ltd were contracted by McKay Electrical, on behalf of Tauranga City Council to supply and commission the DALI-2 cloud based lighting control system for the Waiari Water Treatment Plant in the Bay of Plenty.

Read More...

Smart Environment For Level 9 Fitout PWC Tower

  • Sector: Offices
  • System: zencontrol DALI-2
  • Status: Complete
smart environment for level 9
  • End Client: FNZ
  • Building Owner: Precinct Properties
  • Engineer: Norman Disney Young
  • Electrical contractor: Electrix
  • Control Specialist(s): Manu Bhagwanji | Julian Beckham

IEL were contracted by Precinct Properties to re-design and commission the lighting controls for level 9 of PWC Tower at Commercial to create a smart environment to suit the needs of the incoming tenant.

Read More...

DALI Automation for Costco’s New Zealand Store

  • Sector: Retail | Warehouse
  • System: zencontrol
  • Status: Complete
DALI automation for Costco
  • End Client: Costco
  • Builder: Haydn Rollet
  • Engineer: Norman Disney Young
  • Electrical Contractor: Dickson Gray Electrical
  • Controls Specialist: Sanjiv Gounder

IEL were contracted by Dickson Gray Electrical to design and commission the lighting control system for Costco’s first New Zealand store. The project required control of a mix of DALI lights and relay-controlled (on/off) lights.

Read More...

Animal-Centric Lighting at Auckland Zoo

  • Sector: Zoo (Other)
  • System: zencontrol DALI-2
  • Status: Complete
animal centric lighting
  • End Client: Auckland Zoo
  • Builder: NZ Strong
  • Engineer: Jacobs
  • Electrical Contractor: Caldwell & Levesque
  • Control Specialist(s): Sanjiv Gounder | Bel Arevalo

This large transparent climate-controlled tropical dome at Auckland Zoo is home to Sunda Gharial Crocodiles, Turtles, Tortoises and a variety of fish species. The lighting control is a critical element for the maintenance of the habitat, simulating a daylight cycle suited to the animals housed in the enclosure.

Read More...

Lighting Control for Reserve Bank of New Zealand, Wellington

  • Sector: Offices | Government
  • System: zencontrol DALI-2
  • Status: Completed
DALI dimming system for bank
  • End Client: Reserve Bank of New Zealand
  • Engineer: Norman Disney Young
  • Electrical Contractor: Team Cabling (Wellington) Ltd
  • Controls Specialist: Ian Rose

This upgrade project was for Level 4 of the Reserve Bank at 2 The Terrace, Wellington.  A DALI dimming system was required, but it also needed to be able to control switched 230V and 0-10v lighting, and integrate seamlessly with the AV control in some areas.

Read More...