Switching


Sports Lighting Control Solution

  • Sector: Sporting Facilities
  • System: zencontrol
  • Status: In Progress
Sports lighting DALI upgrade
  • End Client: Auckland Netball
  • Controls Specialist: Sanjiv Gounder
The Auckland Netball Centre is located in St Johns and is considered the home of netball in Auckland. Every year it serves thousands of netballers and spectators for practice sessions and tournament games. It also provides multipurpose sporting and recreation...

Read More...

Green Star Building – New Hangar for Air New Zealand

  • Sector: Transport
  • System: zencontrol
  • Status: Under Construction
Green Star Building for Air New Zealand
  • End Client: Air New Zealand
  • Architect: Studio Pacific Architecture
  • Engineer: Aecom
  • Electrical Contractor: Ward Chandler
  • Controls Specialist: Sanjiv Gounder
Air New Zealand are building a 10,000 square metre hangar at its engineering base at Auckland Airport. It will be the southern hemisphere's largest single-span timber arch aircraft hangar, built largely from plantation pine sourced from Nelson. At one and...

Read More...

Showroom Lighting Management for BMW Motorbike Destination

  • Sector: Retail
  • System: zencontrol
  • Status: Complete
showroom lighting management system
  • End Client: Sime Darby Motors New Zealand
  • Architect: Ignite Architects
  • Engineer: Electrical Consulting Services
  • Electrical Contractor: Team Cabling
  • Controls Specialist: Manu Bhagwanji
July saw the official opening of the new BMW Motorrad showroom on Auckland’s North Shore. Sitting alongside the country's largest BMW car dealership, Sime Darby have created a real hub for BMW enthusiasts. A zencontrol DALI-2 system was installed and...

Read More...

Kakariki Hospital – Healthcare Lighting Control

  • Sector: Healthcare
  • System: zencontrol
  • Status: In Progress
Healthcare lighting control
  • End Client: Kakariki Private Hospital
  • Architect: Klein Limited
  • Engineer: Norman Disney Young
  • Electrical Contractor: Allendale Electrical
  • Controls Specialist: Bel Arevalo

Design of the healthcare lighting control system for this project is underway, with commissioning commencing once the build is further progressed and DALI-2 components installed.
#DALI #lighting control

Read More...

DALI for Lighting Control at Taranaki Base Hospital

  • Sector: Healthcare | Hospital
  • Solution: zencontrol DALI-2 system
  • Status: Design Stage
DALI for lighting system
  • End Client: Te Whata Ora Health New Zealand | Taranaki Base Hospital
  • Builder: Leighs Construction
  • Engineer: Beca
  • Architect: Warren & Mahoney
  • Electrical Contractor: HEL Rimu
  • Controls Specialist(s): Andrew Thompson | Ian Rose

The 6 levels of the new East Wing building will contain 102 DALI networks and the zencontrol system will incorporate more than 40 controllers, 900 sensors, and hundreds of switches including push buttons, rotary dimmers, RGB scene sets, and LCD smart panels.

Read More...

Lighting Control for Aged Care Facilities – Summerset St Johns

  • Sector: Healthcare | Aged Care
  • Solution: zencontrol DALI-2 system
  • Status: In Progress
lighting control for aged care
  • End Client: Summerset Group Holdings Ltd
  • Engineer: Norman Disney Young
  • Electrical Contractor: Strike Electrical (Building A) |Caldwell & Levesque (Buildings D, E + basement)
  • Controls Specialist(s): Manu Bhagwanji

We consider the ability to monitor and maintain the control system remotely, with no requirement to attend site to be a significant benefit for buildings with vulnerable residents or patients. This has become particularly important in recent years with the threat of Covid-19 being introduced by visitors/tradespeople being of considerable concern.

Read More...

DALI-2 Lighting Management for Commercial Office Development

  • Sector: Commercial Offices
  • Solution: zencontrol DALI-2 system
  • Status: In Progress
DALI-2 Lighting Management
  • End Client: Asset Plus Investments
  • Builder: Icon
  • Architect: Ignite
  • Engineer: Beca (Basebuild | Agile (Fitout Council Hub)
  • Electrical Contractor: Bishman
  • Controls Specialist(s): Manu Bhagwanji

6-8 Munroe Lane, Albany is a brand new 26,500m2 (GFA) commercial office development consisting of 1.5 levels of basement and 6 levels of A-grade commercial office space.

Read More...

Light Management for Orams Marine Services Workshops

  • Sector: Other | Boat Storage + Servicing
  • Solution: zencontrol DALI-2 system
  • Status: Complete
Light Management for Orams
  • End Client: Orams Marine Centre
  • Architect: RTA Studio
  • Engineer: Electrical Consulting Services (ECS)
  • Electrical Contractor: East Coast Bays Electrical Services
  • Controls Specialist(s): Manu Bhagwanji | Julian Beckham

The Wynyard Quarter location known as Site 18 on the corner of Beaumont and Jellicoe Streets has been transformed into a centre for Orams Marine that includes a superyacht refit facility, incorporating a travel lift shed.

Read More...