Steel & Tube, Highbrook


Steel Tube Highbrook - Steel & Tube, HighbrookSteel & Tube’s new warehouse facility at Highbrook Business Park was designed to maximise natural light. They required a control system to ensure artificial lighting was kept to a minimum, but also ensure target light levels were met.

Intelligent Environments Limited provided lux level control of lighting zones enabling the user to select manual or automatic functions, as well as time clock schedules for carpark and security lighting.

These relatively complex operations were combined into a simple to use interface that provided intuitive control of the system. The touchscreen interface allows real time feedback as to status of operational mode, lux levels, etc.